Entech is proud to have been involved in the Mineral Resource Estimate at Athena’s Byro FE1 Magnetite deposit, located in the Pilbara region of Western Australia. The estimation was publicly reported to JORC guidelines and ASX regulations with Entech’s Alan Miller as Competent Person. The resource forms the basis of future engineering and mining studies.
Thanks to Athena geologists for the opportunity to collaborate on this MRE update.